NOTICE OF ROAD CONSTRUCTION

posted Jun 23, 2016, 9:18 AM by Arabo Parseghian   [ updated Jul 12, 2016, 8:31 AM ]
ROADS MAY BE CLOSED DURING GRINDING AND PAVING OPERATION.

The City’s contractor, Hardy and Harper, Inc., will be resurfacing various streets throughout the City.  The work includes:
  • Grinding a portion of asphalt concrete roadway pavement.
  • Repaving of asphalt concrete roadway pavement.
  • Striping and signing of roadway follows within two weeks of paving operation.
Street parking and vehicular access will be restricted during grinding and paving operations.  It is required that you keep your vehicle(s) off the street during these operations.  Access to your driveway will be limited during pavement installation and cool down. Please park your car outside of project limits to access by foot.
 
A City Inspector will be present on the jobsite and happy to answer your questions or provide assistance needed.  If you cannot locate the Inspector, please contact the Public Works Department at 818-790-8882 between the hours of 7:00 a.m. and 5:00 p.m.  Thank you in advance for your cooperation while improving City’s infrastructure.

Street Locations

Grinding operation starts on June 28th and paving operation on June 30th for:
  • LOMA VISTA DRIVE: Foothill Blvd to Flanders Road
  • FLANDERS ROAD:  Encinas Drive to past Loma Vista Drive
  • LASHEART DRIVE: North of Flanders Road
Grinding operation starts on June 29th and paving operation on July 1st for:
  • VERDUGO BOULEVARD:  Foothill Blvd to La Tour Way
  • INDIANA AVENUE:  Cul-de-sac
  • UNION STREET: Cul-de-sac
ROADS MAY BE CLOSED DURING GRINDING AND PAVING OPERATION.